Specifications for build objects

Attach the functional and technical specification to each build object (a WRICEF object on SAP, a user story on Salesforce), replace versions, and let FS and TS follow the document.

Who can do this
  • Admin
  • Project manager
  • Functional lead
  • Technical lead
  • Consultant

Updated

Open this in the app
On this page

Every build object has two specification slots: the Functional specification (FS) and the Technical specification (TS). Each slot holds one document from the project's document register. Once linked, the document's status drives the object's FS or TS stage, so the document register and the build list always agree. The build list takes your platform's name, such as WRICEF objects on SAP S/4HANA, CEMLIs on Oracle E-Business Suite or user stories on Salesforce. See Build objects.

Before you start

Check first

  • The build object is saved (the Specifications section appears after it is created)
  • For uploads: a Pro, Enterprise or Lifetime plan, because the document register is part of Pro
  • The specification file, under 50 MB

How to upload a specification

  1. Open the object

    In Scope, open the build tab (WRICEF on SAP, or your platform's term) and select the object.

  2. Find the slot

    Under "Specifications", find Functional specification or Technical specification.

  3. Upload

    Select Upload new. Choose the File. The Title is suggested from the object ID and title, and the Version starts at 0.1. Change either if you like.

  4. Link it

    Select Upload and link. The file is added to the register as a draft, linked to this object.

  1. Choose Link existing

    In the slot, select Link existing.

  2. Pick it

    Choose the document under "Document in the register".

  3. Link

    Select Link.

How to replace a version

  1. Choose Replace

    In the slot, select Replace.

  2. Upload the new file

    The Version moves on by one, for example 1.2 becomes 1.3. Check the Title.

  3. Confirm

    Select Upload and replace. The new file is linked as a draft, and the previous version is marked superseded.

How the stage follows the document

Document status

  • Draft
  • In review
  • Approved
  • Superseded or archived

FS or TS stage

  • In progress
  • Reviewed
  • Approved
  • Left as it was

While a document is linked, the FS or TS field in the lifecycle says "Follows the linked document" and cannot be changed by hand. To move the stage on, change the document's status in the document register.

Good to know

  • Each slot shows the document ID, title, Version, Status, Author and Reviewer. Open opens the file in a new tab.
  • In the build list's table, the FS and TS columns show the status chip and a document icon. A crossed-out icon means no document is linked. Hover to see the version, status, author and reviewer.
  • Linking only needs the right to edit the object. Uploading also needs the right to upload documents.
  • In the demo workspace, uploads are turned off.
  • A specification can go through review and signature like any other document. See E-signatures.

Who can do this

Admins, project managers, functional leads and technical leads can link and upload specifications on any object. Consultants can do it on objects where they are the functional or technical owner.