Test cycles you can report on, from unit test to dress rehearsal.

Organise scenarios and cases by cycle: unit, system integration, user acceptance, regression, performance and cutover dry run. Each case has steps, a tester, an actual result and a status.

Import cases from an Excel template that starts with example cases for the project's platform, raise a defect as an issue in one step, and see which build objects have test coverage.

Capexo test cycles with pass rate and defects, with example data

Test cycles, scenarios and cases, with defects raised as issues.

In the app, this module is these workspace tabs: Testing.

What the module covers

  • Cycles that match your plan

    Unit, SIT, UAT, regression, performance and cutover dry run, each with its own scenarios, cases and progress charts.

  • Cases with steps and results

    Assign a tester, record the actual result and status of each case and see the pass rate for the cycle.

  • Excel templates

    Download the template, which starts with example cases for the project's platform, fill it with the cases your team already wrote, and import it into the cycle.

  • Defects become issues

    From a failed case, raise an issue in the RAID log in one click, linked back to the case, so defects are triaged with every other issue.

How a programme uses it

  1. Load the cycle

    Import scenarios and cases from the template and assign testers.

  2. Run and record

    Testers record each case's result. A failed case can raise an issue linked to it.

  3. Report the exit position

    Pass rates by cycle and build object coverage give you the numbers to judge the cycle against its exit criteria.

Where it helps most

A test cycle board with entry and exit criteria columns beside a laptop showing passed test results.

Testing: common questions

Can we import our existing test scripts?

Yes. Download the Excel template, copy your scenarios and cases into it, and import it into the cycle.

Does a failed test create a defect?

A failed case can raise an issue in the RAID log, linked back to the case, so defects follow the same triage as other issues.

See this module with your programme in mind.

Tell us which application you are implementing and where the programme is today. We will show you how this module would hold your work.